CHECK MAIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mandatory Disclosure Format (Page-3)

 

5. Building :
 
1.
Construction of the building is complete        
:
Yes
2.
Building is yet to constructed
:
N/A
3.
Building is fire safety-proof
:
Yes
4.
Building is disabled friendly
:
Yes
5.
Common room for boys/girls available
:
Yes
6.
Date of completion of the Building
:
01.11.2003
7.
Covered Area in sq mt.          
:
3180 Sq.Mtrs.
8.
Number of classrooms
:
08
9.
Other facilities
:

All facilities are
available

 

6. Library:
 
1.
The Library has separate reference section/Journals section and reading room
:
Yes
2.
Number of books/reference books
:
7000
3.
Total number of educational Journals/periodicals being subscribed
:
10
4.
Number of encyclopedias available in the library
:
06
5.
Seating capacity of the reading room of the library
:
60

 

7. Instructional Facilities:
 
1.
Details laboratories available (p attach annexure)
:
All equipments are available in lab
2.
Arrangement made for practice teaching     
:
College will conduct 40 days teaching in 10 schools.
3.
Number and Name of school (s) for practice teaching
:
10

 

 

Copyright© 2008. City Public Degree College. All Rights Reserved
Designed, Developed & Hosted by VISIONTECH SYSTEMS